Home / Impact / Projects / Wapello Solar

Wapello Solar

Project Background

The Wapello Solar project was developed by Clēnera. Clēnera partnered with Renewable Energy Systems (RES) to construct Wapello Solar in six months, creating approximately 250 jobs at peak construction. Despite beginning construction during the COVID-19 pandemic, Wapello Solar progressed with little to no delays.

Key Facts

  • 128 MWAC
  • RES
  • Wapello, IA
  • Install 2020
  • Clenera
  • Powers 21,000 homes with clean energy

Ready to Simplify Your Project?

Our customised plug-and-play EBOS solutions reduce materials, installation labour, and O&M touchpoints throughout the project’s lifespan, significantly cutting timelines, lowering costs, and enhancing longevity and sustainability.